Array
(
[0] => Array
(
[id] => 4
[name] => Types of work
[value] => Preparation for the demolition included taking actions to preserve the nearby structures (a fuel feeding system 3 m away from the crane leg and an overhead cable tray 6 m away from the crane leg):
- Design developed, cutting places determined.
- Trolley moved to the central position.
- Cantilever collapsed separately.
- Legs tied diagonally with wire ropes; one of the legs tied with wire ropes to the crane’s rail track foundation.
Crane characteristics:
| 35 m |
Crane height |
| 126 m |
Crane length |
| 950 t |
Crane weight |
| 32 t |
Lifting capacity |
| 80 m |
Cutting distance |
| 25 mm |
Thickness of cut metal |
[value_id] => 789
[use_animation] =>
[text] =>
[type] => editor
[measure_unit] =>
[link] =>
)
[1] => Array
(
[id] => 11
[name] => Industry
[value] => Electrical power industry
[value_id] => 118
[use_animation] =>
[text] =>
[type] => select
[measure_unit] =>
[link] =>
)
[2] => Array
(
[id] => 12
[name] => Region
[value] => Kurgan region
[value_id] => 10
[use_animation] =>
[text] =>
[type] => select
[measure_unit] =>
[link] =>
)
)
Types of workPreparation for the demolition included taking actions to preserve the nearby structures (a fuel feeding system 3 m away from the crane leg and an overhead cable tray 6 m away from the crane leg):
- Design developed, cutting places determined.
- Trolley moved to the central position.
- Cantilever collapsed separately.
- Legs tied diagonally with wire ropes; one of the legs tied with wire ropes to the crane’s rail track foundation.
Crane characteristics:
| 35 m |
Crane height |
| 126 m |
Crane length |
| 950 t |
Crane weight |
| 32 t |
Lifting capacity |
| 80 m |
Cutting distance |
| 25 mm |
Thickness of cut metal |