Moscow Oil Refinery of Gazpromneft
Types of work
Dismantling metal structures by plasma arc or gas cutting
Industry
Oil industry
Region
Moscow region
Demolition of process pipelines, vessels, and pipe racks at 10 sections due to commissioning the Euro+ facility at the Moscow Oil Refinery.
Special focus was placed on extra-hazardous operations. Their progress was controlled by the customer through the work permit approval procedures and daily quality monitoring commissions.
The total length of the removed pipeline was 34,148 linear meters; the pipe diameter varied from 20 to 1,000 mm.
119 cubic meters of reinforced concrete was disposed of, along with 290 cubic meters of mineral wool and 926 tons of scrap metal for subsequent recycling