Railway overbridge
Types of work
Technique
Truck crane, lifting capacity 400t
Featuresbridge length 276m
Region
Voronezh region
Operations on renovating the junction at the intersection between Leninsky Prospect and Ostuzhev Street in Voronezh included demolition of an overbridge with a total length of 276 m. The bridge span over the operated railway was disassembled within a limited time period from 02:00 to 03:00 am. Diamond-cutting equipment, a truck-mounted crate with a weight-lifting capacity of 400 t, and excavators with a set of attachments (hydraulic shears and a hydraulic hammer) were used for this project.