Multi-purpose hospital in Mezhdurechensk
Рассчитать стоимость работDemolishing the frame of seven-story buildings with an underground part.
The construction of the multi-purpose hospital complex began in the 1980s and was suspended twice (in 1991 and 2014). At the time of the demolition, its structures had multiple mechanical and corrosive damage and could not be repaired: areas of non-vibrated concrete emerged because of low-quality installation. Concrete spalling caused by mechanical impact was discovered on pillar ties and stiffening diaphragms. The cavities and damaged areas were repaired with a low-strength concrete mortar that was crumbling.
By the end of 2022, buildings of the multi-purpose hospital in Mezhdurechensk will emerge on the cleared site within the state program of Healthcare Development.