Smart dismantling

Mechanized dismantling

Special blasting

[value_id] => 732 [use_animation] => [text] => [type] => editor [measure_unit] => [link] => ) [1] => Array ( [id] => 6 [name] => Technique [value] =>

Liebherr R954C Demolition (34m boom)

Hyundai R360 LC-7 Demolition (21m boom)

Hyundai R520 LC-9S

[value_id] => 733 [use_animation] => [text] => [type] => editor [measure_unit] => [link] => ) [2] => Array ( [id] => 7 [name] => Features [value] => Structural volume 800 000 cubic meters, Max height +150m [value_id] => 739 [use_animation] => [text] => [type] => text [measure_unit] => [link] => ) [3] => Array ( [id] => 10 [name] => Logo [value] => Array ( [0] => Array ( [type] => link [link] => [id] => 1122 [width] => 500 [height] => 500 [alt] => [title] => [src] => /userfls/shop/imgraz/1121_oao-ufaleynikel.jpg [vs] => Array ( [large] => /userfls/shop/imgraz/1121_oao-ufaleynikel.jpg [logos] => /userfls/shop/logos/1121_oao-ufaleynikel.jpg ) ) ) [value_id] => [use_animation] => [text] => [type] => images [measure_unit] => [link] => ) [4] => Array ( [id] => 11 [name] => Industry [value] => Metal industry [value_id] => 107 [use_animation] => [text] => [type] => select [measure_unit] => [link] => ) [5] => Array ( [id] => 12 [name] => Region [value] => Chelyabinsk region [value_id] => 16 [use_animation] => [text] => [type] => select [measure_unit] => [link] => ) )
FeaturesStructural volume 800 000 cubic meters, Max height +150m
Industry Metal industry
Рассчитать стоимость работ

Teardown and removal of non-operated buildings and structures of Ufaleynickel, the town’s key employer.

Demolition took 6 months through:

  • mechanized demolition of over 100 buildings and structures;
  • specialized blasting operations to demolish two reinforced concrete smokestacks over 150 m and over 100 m high.

The following machinery was employed:

  • 2 Liebherr crawler excavators (Demolition version) with a 34-meter boom;
  • 15 crawler excavators with attached hydraulic shears and hydraulic hammers;
  • over 20 pieces of other construction machinery of various applications, e.g., dump trucks, truck-mounted cranes, and bulldozers.

Reforma Group’s team had to handle massive metal structures and their complex spatial positioning—reinforced concrete smokestacks up to 150 meters high, a massive gas treatment unit building, a crane trestle made of metal beams and pillars 2 meters in diameter and 50 meters high, and foundations removal.

50,000 cubic meters of foundations were torn down and removed.

180,000 cubic meters of structures in solid-body equivalent were dismantled with the total structural volume of 800,000 cubic meters.

The site was cleared for the construction of Zinc Electrolysis Plant (customer: Polymet Engineering LLC; scheduled commissioning time: 2022).

Material: metal structures, concrete, reinforced concrete, brick lining.